Epomena

Options compared

The project next to doing nothing, side by side. Change any number and everything recalculates.

Real project10 published · 5 derived5 assumptions

Options

Gulf Breeze Highway 98 utility undergrounding (CRA-financed)

Santa Rosa County · published and derived values; assumptions are labelled

Alternatives


Time horizon

%
%

Candidate route and service density

Extension
1.9 mi
Mapped alignment 1.93 mi
Connections
—
No connection demand
Available capacity
Unknown
Utility confirmation needed

Assumptions — Underground US 98 (as built)

Capital, operations and demand

mi
$
2022 dollars
yr
cost spread evenly
$
a year, in price-year dollars
$
a year, per mile
yr

Gulf Breeze CRA tax increment (county + city)

$
yr

Lifecycle outlook

Break-even calculation

Not calculatedNeeds connection demand and a route length.

Net value to the owner, by years looked at

−$6.8M whether you look 20, 40 or 60 years ahead: the project brings the owner no income, so its cost to the owner does not change with the years counted.

Each option compared with doing nothing

AlternativeCapitalNet value to ownerBenefit ÷ cost
Underground US 98 (as built)$7.2M−$6.8MNot measured

The owner’s cash is discounted at 4.8% a year in nominal dollars; the benefit-cost ratio at 7.0% in real dollars.

Open loan and repayment

Screening only, not engineering design. No implied connection approval